Descrizione
When North Street was repaved, I think in 2016 or 2017, I brought to your attention that the loading and unloading of heavy equipment, tractors, excavators etc, had caused damage to the south end of HGC.
You rightly pointed out that the extreme south end had been paved over but I was always insistent that such remedial work failed to address the more extensive damage, slightly further north.
This is now becoming much clearer as potholes-to-be are readily apparent in parallel lines and will only get worse as winter approaches. They will have the effect of icing over in cold temperatues and neighbours are rightly concerned that the tracks will form dangerous ice hazards.
Is there any chance that your engineers can have a look at this before it gets worse? Some filling, or something more substantial, before winter would be as welcome as it is necessary.
1 Commento
Riconosciuto Burlington, VT (Ufficialità verificata)